What to do when a part is wrong, short, damaged or fails inside warranty — the four steps, who pays the freight, and how long each stage takes.
This policy applies to business customers buying from Honvale, a brand of Chongqing Hongjifangxiang Technology Co., Ltd. Every sale through this site is business-to-business.
The EU consumer rules on distance selling — including the 14-day right of withdrawal — apply to consumers buying for private use, not to a company buying components for its business. We nonetheless accept returns in the cases set out below, which is a voluntary policy and does not affect your statutory rights under the terms of sale.
| Situation | What we need from you |
|---|---|
| The part delivered is not the part ordered — wrong thread, wrong material, wrong code | Invoice number, part code on the label, photograph of the label and the part |
| Quantity short against the packing list | Packing list, carton weight if available, photograph of the sealed carton as received |
| Damaged in transit | Photographs before unpacking, and the damage noted on the carrier's delivery document |
| A manufacturing defect found on inspection or in service | Batch or lot marking, quantity affected, description of the failure, photographs — and the parts themselves if we ask |
| Failure inside the 12-month warranty | As above, plus the installation conditions: torque applied, temperature, medium, and what the part was fitted to |
| Case | Outbound | Return |
|---|---|---|
| Our error — wrong part, short shipment, confirmed defect | We pay | We pay, or we reimburse a tracked service |
| Damage in transit, noted on the delivery document | We pay | We pay and claim from the carrier |
| Warranty claim accepted | We pay for the replacement | We reimburse reasonable return freight |
| Claim rejected — part conforms, or failure is outside warranty | — | You pay, including return freight to you if you want the parts back |
| Change of mind on unopened stock (at our discretion) | — | You pay both ways, plus any restocking charge we quote first |
We inspect against the batch record and the specification. Where the cause is not obvious we may test the part — airflow, pressure hold, or a cross-section of the membrane — and we will send you the result, including when it does not support your claim. We aim to decide within 10 working days of the parts arriving; if a test takes longer we tell you the date we expect to finish.
Refunds are paid by bank transfer in the currency of the original invoice, within 10 working days of the decision, net of any bank charges at our end. We do not refund more than the invoice value of the affected goods, and we do not refund freight, duty or tax you paid to a third party.
Parts are warranted against defects in material and workmanship for 12 months from delivery, or for the period stated in the quotation if different. The full warranty terms, including the exclusions, are in section 10 of the terms of sale.
What the warranty is not: it is not a performance guarantee for your enclosure, and it does not cover a part that met its datasheet but did not suit the application. If a valve passes its airflow and pressure-hold figures and the cabinet still condenses, the valve is doing its job and the sizing or the duty cycle needs another look — we will help with that analysis, and it is usually worth doing before the next batch is ordered.
Sample charges are not refundable, except where the sample itself is defective or is not the part you ordered. Sample freight is not refundable. Where a quotation says the sample charge is credited against the first production order, that credit is applied automatically to the invoice for that order.
Tell us. A rejection is a technical conclusion, not a negotiating position, and it can be wrong — a photograph can hide the failure mode, and a batch record can be misread. Ask for the test data behind the decision and for the engineer who made it; we will send both.
If that does not resolve it, the escalation route is the one in the terms of sale: negotiation between senior representatives, then arbitration. For a component of this value, both sides usually find that a replacement and a correction to the drawing cost less than the argument.
To start any claim: sales@honvale.com · +86 195 0239 6968 · No. 41-2 Beiyuan Road, Yinglong Town, Nan'an District, Chongqing 400000, China.