1. Scope — who these terms are for
These terms govern every quotation, order and delivery of goods by us to a business customer. They are not consumer terms: by placing an order you confirm that you are acquiring the goods for the purposes of your business, and that you have authority to bind the company named on the order.
Where a signed contract, a proforma invoice or a written amendment agreed by both sides says something different, that document prevails over these terms. Otherwise these terms apply to the exclusion of any terms printed on your purchase order, even if we do not expressly object to them.
2. Definitions
- We / us / Seller — Chongqing Hongjifangxiang Technology Co., Ltd., trading as Honvale.
- You / Buyer — the company placing the order.
- Goods — vent plugs, breather valves, pressure relief valves, cable glands and related components supplied by us.
- Contract — the contract of sale formed under section 4.
- Specification — the datasheet for the part, or the drawing agreed in writing for a custom part.
- Incoterms — Incoterms® 2020, ICC publication 723E.
3. Quotations
- A quotation is valid for 30 days from its date unless it states a different period. After that we may re-quote, and price may change with raw material and freight cost.
- Quoted prices are exclusive of VAT, customs duty, import taxes and any destination charges, unless the quotation says otherwise.
- A quotation is not an offer capable of acceptance where it depends on a specification that is still open — for a custom part, the price holds only once the drawing is agreed.
- Quantities, prices and lead times are quoted per line item; a change to quantity can change the unit price, and we will tell you before the order is confirmed.
4. How a contract is formed
A contract is formed when we issue a written order confirmation or proforma invoice and you pay the amount it requires — whichever happens later. An enquiry, a verbal agreement, a WhatsApp exchange or a purchase order on its own does not create a contract.
Where a proforma invoice is issued, its content — part numbers, quantities, unit prices, Incoterm, payment terms and lead time — forms part of the contract and prevails over these terms and over your purchase order.
5. Specifications, drawings and tolerances
- Catalogue parts are supplied to the datasheet published on this site or sent to you, including its stated tolerances. Figures given as typical are typical, not guaranteed limits.
- Custom parts are supplied to the drawing we both sign off. We build and inspect to that drawing; we do not take responsibility for whether the drawing itself is correct for your application.
- Where you supply the drawing, you confirm that it is complete, that it defines the critical dimensions and the material, and that using it does not infringe a third party's rights. If a dimension is missing we will ask before quoting rather than assume it.
- Performance figures that depend on your installation — airflow through a complete enclosure, pressure hold with your gasket, IP rating achieved on your housing — are only binding where we have tested your assembly and said so in writing. A valve's own rating is not a rating for the box it is fitted to.
- Small deviations in colour, surface finish and mould texture within normal commercial tolerance are not defects.
6. Samples
Samples are supplied against a sample charge plus freight, unless we agree otherwise in writing. The sample charge is normally credited against the first production order of the same part, as stated in the quotation. Samples are for evaluation and are not covered by the production warranty beyond being free from defect on arrival.
7. Prices, currency and payment
- Prices are quoted in the currency stated on the quotation, normally USD. Payment is by bank transfer (T/T) unless another method is agreed in writing.
- Unless credit terms are agreed in writing, the first order is supplied against prepayment, and later orders against the split stated on the proforma invoice.
- Bank charges outside China are for your account; charges inside China are for ours. Where a transfer is short by a bank fee, the balance is due before documents are released.
- Credit terms, where agreed, are stated in writing and are counted from the invoice date. Overdue amounts may carry interest at 0.05% per day, and we may suspend open orders while an invoice is overdue.
- We may adjust the price of an unshipped order if the specification changes at your request, or if a raw material or freight surcharge arises that neither side could have foreseen when the order was placed. We will tell you the new figure before proceeding, and you may cancel that order line without penalty.
8. Delivery, risk and title
- Delivery is made on the Incoterm stated in the quotation or proforma invoice. Risk passes as that Incoterm provides.
- Lead time runs from the later of: receipt of the down payment, and written approval of the drawing or specification. It is a working-day estimate, not a guaranteed date, unless we have expressly guaranteed a date in writing.
- Partial shipments are allowed where the proforma invoice provides for them. Each shipment is invoiced and paid separately.
- Title in the Goods passes only when we have received payment in full, notwithstanding delivery or the passing of risk.
- Where you nominate your own forwarder, we deliver to that forwarder and our delivery obligation is complete at that point.
9. Inspection, shortage and claims
- Inspect the Goods on arrival. Claims for shortage, wrong part or visible transport damage must reach us in writing within 15 days of delivery, with the invoice number, batch or lot marking, quantity affected and photographs.
- Damage in transit must also be noted on the carrier's delivery document at the time of receipt; without that note the carrier will reject the claim, and we cannot recover it either.
- Latent defects that could not have been found on reasonable inspection must be notified in writing as soon as they are discovered and within the warranty period in section 10.
- Goods may not be returned without a return authorisation issued by us — see the returns and refunds policy.
10. Warranty
We warrant that the Goods conform to the Specification and are free from defects in material and workmanship for 12 months from delivery, or for the period stated in the quotation if different.
If a valid warranty claim is made, we will at our option repair or replace the affected Goods, or credit their invoice value. Replacement is the normal remedy for a component of this value; a refund is offered where replacement is not practical.
The warranty does not cover: normal wear; damage in transit after risk has passed; installation or tightening beyond the stated torque; use outside the rated temperature, pressure or chemical compatibility range; unauthorised modification or repair; a part made to your drawing that conforms to that drawing; or failure caused by another component in the assembly.
Where we ask for failed parts to be returned for examination, we reimburse reasonable return freight if the claim is accepted.
11. Limitation of liability
- Our total liability arising from a Contract — whether in contract, tort, breach of statutory duty or otherwise — is limited to the invoice value of the Goods giving rise to the claim.
- We are not liable for indirect or consequential loss, including loss of profit, loss of production, plant shutdown, loss of contracts, penalty payable by you to your customer, or the cost of removing and reinstalling a part.
- Nothing in these terms limits liability for death or personal injury caused by negligence, for fraud, or for any liability that cannot lawfully be limited.
- You are responsible for the cost of any recall or field action that you initiate, except to the extent it is caused by a defect we are liable for under section 10.
12. Certifications and the buyer's responsibilities
The Goods are industrial components, not safety devices. A vent plug or pressure relief valve supplied by us equalises pressure; it is not an explosion-vent panel, rupture disc or certified pressure-relief device, and it is not a substitute for one. Where an application requires such a device — for example under NFPA 68, NFPA 855, EN 14491 or the pressure-equipment rules of your market — that device must be specified, certified and installed separately.
- Any certification, approval or marking that applies to a part is stated in the datasheet or the quotation for that part. Unless a certificate is expressly listed there, none is supplied with the Goods. Parts are supplied as industrial components without ATEX, IECEx, UL or CE marking unless the quotation says otherwise.
- You are responsible for assessing whether the part is suitable for the intended application, for the design of the enclosure it is fitted to, and for obtaining any approval required in the destination market.
- You are responsible for compliance with the import, labelling and product-safety rules of the country you sell into, including any obligation to register as importer or to hold technical documentation.
13. Intellectual property and tooling
- Our designs, drawings, datasheets, moulds, fixtures and process documentation remain our property. Nothing in a Contract transfers them.
- A drawing you supply remains yours. You grant us a licence to use it only to the extent needed to quote, manufacture, inspect and ship your order.
- We retain ownership of any tooling we build, including tooling paid for in part by you, unless a written agreement states that ownership transfers. Where you have paid for tooling in full and a written agreement says so, we will hold the tool for your exclusive use while orders continue.
- We may refuse an order where a drawing appears to copy a third party's protected design, and we may ask for evidence that you are entitled to use it.
- Unless you object in writing, we may show the fact that we supply you as a customer reference — not your drawings, volumes or prices.
14. Confidentiality
Each side keeps the other's non-public technical and commercial information confidential, uses it only for the Contract, and does not disclose it for three years after the last delivery, except to employees and advisers who need it, or where disclosure is required by law. This does not cover information that is already public, or that the receiving side can show it developed independently.
15. Export control and sanctions
You confirm that the Goods will not be re-exported in breach of applicable export-control or sanctions rules, and that they are not intended for a military end-use prohibited by the law applicable to the transaction. We may decline or delay a shipment where an export licence or an end-use declaration is required and not provided.
16. Force majeure
Neither side is liable for a delay caused by an event beyond its reasonable control — natural disaster, epidemic, war, civil disruption, government action, port closure, carrier failure, or a shortage of a raw material that could not reasonably be foreseen. The affected side notifies the other promptly, the deadline is extended by the length of the delay, and either side may cancel the unperformed part of the order if the delay exceeds 90 days.
17. Termination
Either side may terminate a Contract immediately by written notice if the other commits a material breach and does not remedy it within 14 days of notice, or becomes insolvent. Termination does not affect the obligation to pay for Goods already delivered, or any provision that by its nature survives — including sections 11, 13, 14 and 18.
18. Governing law and disputes
These terms and every Contract are governed by the laws of the People's Republic of China, excluding its conflict-of-law rules and the UN Convention on Contracts for the International Sale of Goods.
If a dispute arises, the parties will first attempt to resolve it by negotiation between senior representatives for 30 days from written notice. If that fails, the dispute is finally settled by arbitration administered by the China International Economic and Trade Arbitration Commission (CIETAC) under its rules in force at the time, with the seat of arbitration in Chongqing and the proceedings conducted in English. The award is final and binding on both parties.
19. General
- Severability — if one provision is held invalid, the rest stays in force.
- No waiver — if we do not enforce a right once, we do not lose it.
- Entire agreement — these terms, the quotation and the proforma invoice are the whole agreement on their subject.
- Assignment — you may not assign a Contract without our written consent; we may assign it to a successor of the business.
- Notices — in writing, by email to the address used in the order, effective on the next working day.
- Language — these terms are drawn up in English, which prevails over any translation.
- Version — 1.0, 11 November 2026. The version in force is the one published on this page when the Contract is formed.