Honvale supplies ePTFE waterproof vent plugs, pressure relief valves and cable glands for sealed industrial enclosures. We are an engineering-led company in Chongqing, China, working on one discipline — keeping a sealed cabinet pressure-equalised without letting water in — and expanding the product family around it.
We are mechanical engineers, and we came at this from the other side of the drawing: sizing vents for battery packs and outdoor cabinets, then asking why a valve that passed validation failed eighteen months into service in the field. That question is where we started — and it keeps opening into new product lines.
That experience produced an obvious conclusion. The failure was rarely the membrane material — it was the process around it. A bond that was reworked by hand, an airflow figure quoted from a catalogue rather than measured on the lot, a valve with no way to tell whether it was still doing its job. So we built a company around controlling those specific steps — a written specification for every part we ship, and inspection against it before the goods leave, rather than buying what is already on a shelf and relabelling it as our own.
We stay deliberately focused on one thing: every opening cut through the wall of a sealed enclosure. Cable entries, breathing ports, pressure-relief points. We do not spread into gaskets, general rubber products, or anything that is not an opening in an enclosure wall — which is why a cable gland belongs here as much as a vent plug does. Inside that boundary the family keeps growing: from standard vent plugs today, to failure-indicator plugs and anti-icing relief valves in validation, and the next additions already on the roadmap. That focus is why we can adjust a membrane stack or a spring rate for one customer's duty cycle without it becoming an exception to a product plan.
“Every step in our process has to justify itself on the bench — nothing survives here just because it has always been done that way.”
What that means for a buyer: you deal with the engineer who designed your part, you get the measured test record for the parts you actually receive, and you get a straight answer — including “we cannot verify that yet” — when a requirement sits outside what we can currently prove.
They cost us orders occasionally. They are also the reason buyers stay once they have tested our parts.
If a figure has not been measured, it does not go on a datasheet. Where a customer needs a specification we cannot yet verify, we say so and agree a test plan instead of printing an optimistic number.
Testing before marketingMembrane lamination, insert bonding, assembly and lot testing each have a written process sheet that we issue and hold. Parts are inspected against it before goods leave. We own the specification, the material callout and the release criteria — we do not sell someone else's valve with a new part number.
Process controlIf a requirement is outside our capability, if a tooling cost will not amortise at the volume you have, or if a lead time is unrealistic — you hear it before purchase order, not after.
No engineering theatrePressure imbalance inside a sealed enclosure, and the fact that nobody finds out about it quickly enough.
Our core development programme. A standard M20×1.5 vent plug body — PC/PA66, V-0, ePTFE membrane — with a colour-change indicator integrated behind a toughened window. A maintenance engineer sees membrane saturation or blockage from outside the cabinet, without opening a single fastener.
A spring-loaded relief valve for NEV battery-pack thermal management, with an anti-icing collar at the seat. The problem it solves is specific: in cold-climate duty cycles, condensate can freeze at a conventional valve seat and lock the poppet shut — exactly when the pack needs to shed pressure.
We do not own a moulding shop or a laminating line. The parts are built by specialist factories we have qualified; what we own is the other half of the job — the specification every step runs to, the incoming inspection when parts arrive, and the release decision before anything ships. Our business licence covers development, technical service and export, and does not list manufacturing — you will find that out during supplier qualification anyway, so it is on this page rather than in a surprise.
Tooling is quoted as its own itemised line, so you can see exactly what you are paying for — nothing is bought ahead of a contract. When a programme justifies a second mould, a dedicated inspection cell or a bench of its own, we will price it as a separate project rather than burying the cost in the unit price.
Discuss tooling and capacityePTFE is laminated to its support layer, treated for oil resistance and die-cut before bonding. We specify the laminate grade and the bond process, then check airflow on the laminate itself rather than on the finished valve — a finished valve hides a bad laminate.
Polymer housings in PA66, PC and PBT, including flame-retardant grades, moulded to our drawings and to yours. We hold the drawing, the material callout and the tool; the moulder runs the press. Tooling is quoted as its own line, with the part.
Brass, stainless and aluminium bodies turned and milled to drawing. Threads are gauged on incoming inspection rather than assumed, and plated finishes are specified in writing before any order is placed.
Seals fitted and each lot checked for airflow and water-entry pressure before release. Every shipment leaves with that lot's record attached — ask for it on any part number and we will send it.
Process steps run to a written specification, and each shipment is released against it. If you want to audit the factory that runs a step before you place an order, we arrange the visit and go with you.
No padded history and no borrowed achievements — this is the actual sequence of events so far, dated, so you can judge the progress for yourself.
Company registration details, business licence and export documentation are supplied to buyers during qualification.
Honvale established in Chongqing as a technology company focused on venting and enclosure protection components.
Vent plug platform taken from concept to a released drawing set covering M5 to M20×1.5, with the laminate grade and the bond process specified per size.
Adhesive-backed ePTFE patches from Ø6 mm to Ø28 mm, die-cut to shape for sensor and panel applications.
IV-M20 indicator vent plug. Sensitivity, ageing and cycle life are still open items; sample parts are available for design-in.
IV-M20 spec sheetRV-M20-AI spring-loaded relief with heated seat collar, aimed at liquid-cooled NEV battery-pack venting.
RV-M20-AI spec sheetThird-party IP-rating and salt-spray reports for main part numbers, automotive material declarations, and expanded test capacity.
No account manager relaying questions to an engineer. No minimum-order posturing. No datasheet figure that turns out to apply to a different configuration.
Send the enclosure details or your drawing and we will reply with a calculation, a recommended part and an honest view of what we can verify.